FAQs
How will the works affect me?
Temporary traffic management will be in place on Ōmokoroa Road from the Prole Road intersection to the railway bridge. This will include lane shifts and contraflow to maintain traffic flow in both directions, with a reduced speed limit of 30 km/h to ensure the safety of the community and our team. Through the narrower sections, stop/go controls may be used.
To enable construction works across Flounder Drive, the intersection of Ōmokoroa Road and Flounder Drive will be closed for several months (approx March to October 2025). A detour will be in place via Ōmokoroa Road, Ridge Drive, and Stingray Drive during this time.
For the safety of residents and the community, we have also closed pedestrian access to Ōmokoroa Road from Kahawai Place, Anglers Way, and Flounder Drive. Access to Ōmokoroa Road from this area is now only available via Ridge Drive. This closure will remain in effect until footpath work on the eastern side of Ōmokoroa Road is completed, which is expected by the end of October 2025.