Timeline
Demolition underway
Demolition is well underway, with all concrete surfaces in the outdoor areas having been removed. We've started dismantling the plant room, and the ceilings in the changing rooms have been removed so insulation can be installed.
Once the demolition work is finished, we'll start building the bulkhead in the pool.
Excavation and demolition completed
All the excavation and demolition work is finished, and the pipe work is well underway.
And we've finished putting the insulation and ceilings into the reception area and changing rooms.
Next up, we'll be starting on the blockwork for the bulkhead, pressure testing the pipes and installing a new injection bore to return used geothermal to the underground water supply.