Omokoroa Domain Playground - Draft Concept Design Plan

Share Omokoroa Domain Playground - Draft Concept Design Plan on Facebook Share Omokoroa Domain Playground - Draft Concept Design Plan on Twitter Share Omokoroa Domain Playground - Draft Concept Design Plan on Linkedin Email Omokoroa Domain Playground - Draft Concept Design Plan link

Engagement on the draft concept design plan has concluded. 

The next steps are:

- Go through all feedback received.

- Produce a final design plan.

- Council decision/ratification on the final design.

Council will communicate the final decision in the coming months on our website and through local Omokoroa news channels.

Omokoroa Domain Playground Concept Plan Adopted 8 September 2020:

  • Check out Council's website (media release and adopted plan).
  • Construction of the playground is expected to start in March 2021 and be completed by June 2021.
  • The upgrade cost of $1.04 million is funded through a mixture of existing asset renewal funding and capital works funding.





Have your say on the draft concept design plan for the Omokoroa Domain Playground.


Engagement ends at 4.00pm on Friday 31 January 2020.


Western Bay of Plenty District Council and Pirirakau hapū would like to thank the principals, teachers and students from the following schools with their help on the development of the draft concept design plan:

  • Omokoroa Point School, 37 Hamurana Road
  • Pahoia School, 29 Esdaile Road
  • Whakamarama School, 476 Whakamarama Road
  • Te Puna School, Te Puna Road
  • Omokoroa No. 1 School, 11 Emeny Road.

Background:

Following the student design showcase event earlier this year, a draft concept design plan for the Omokoroa Domain Playground has been developed.

It is intended that the playground will complement the existing domain and esplanade areas and be a fun place for kids of all ages to play.

Proposed key features include:

  • Pendulum basket swing

  • Sand play equipment

  • Tension-net climbing structure

  • Mouse wheel

  • Musical equipment

  • Shade structures over selected play areas.

Have your say:

  • We want to know what you think of the draft design.
  • Click on the Omokoroa Domain Playground Draft Concept Design Plan document (above right) to download the proposed plan.
  • Have your say (below) by filling out the feedback form.

Omokoroa Domain Playground Concept Plan Adopted 8 September 2020:

  • Check out Council's website (media release and adopted plan).
  • Construction of the playground is expected to start in March 2021 and be completed by June 2021.
  • The upgrade cost of $1.04 million is funded through a mixture of existing asset renewal funding and capital works funding.





Have your say on the draft concept design plan for the Omokoroa Domain Playground.


Engagement ends at 4.00pm on Friday 31 January 2020.


Western Bay of Plenty District Council and Pirirakau hapū would like to thank the principals, teachers and students from the following schools with their help on the development of the draft concept design plan:

  • Omokoroa Point School, 37 Hamurana Road
  • Pahoia School, 29 Esdaile Road
  • Whakamarama School, 476 Whakamarama Road
  • Te Puna School, Te Puna Road
  • Omokoroa No. 1 School, 11 Emeny Road.

Background:

Following the student design showcase event earlier this year, a draft concept design plan for the Omokoroa Domain Playground has been developed.

It is intended that the playground will complement the existing domain and esplanade areas and be a fun place for kids of all ages to play.

Proposed key features include:

  • Pendulum basket swing

  • Sand play equipment

  • Tension-net climbing structure

  • Mouse wheel

  • Musical equipment

  • Shade structures over selected play areas.

Have your say:

  • We want to know what you think of the draft design.
  • Click on the Omokoroa Domain Playground Draft Concept Design Plan document (above right) to download the proposed plan.
  • Have your say (below) by filling out the feedback form.
  • CLOSED: This feedback form has concluded. Thank you for your feedback.

    Hello, thanks for taking the time to have your say on this important issue.


    It will take about 5-10mins to provide your feedback.


    Please provide your feedback by 4.00pm Friday 31 January 2020.

    Engagement on the draft concept design plan has concluded. 

    The next steps are:

    - Go through all feedback received.

    - Produce a final design plan.

    - Council decision/ratification on the final design.

    Council will communicate the final decision in the coming months on our website and through local Omokoroa news channels.

    Share Feedback Form - Omokoroa Domain Playground Draft Concept Plan on Facebook Share Feedback Form - Omokoroa Domain Playground Draft Concept Plan on Twitter Share Feedback Form - Omokoroa Domain Playground Draft Concept Plan on Linkedin Email Feedback Form - Omokoroa Domain Playground Draft Concept Plan link